2009-02-14 New Ranger's Shop update

All these pictures were taken of Saturday, 2/14/09.  They show the huge progress with the interior walls of the New Ranger's Workshop and Storage area.

The Rangers OfficeThe Rangers Office

Ranger's office, the door leads outside.Ranger's office, the door leads outside.

The bathroom and shower which will be in the building.The bathroom and shower which will be in the building.

This is in the main shop area.  The left foor goes to the Rangers office and the bathroom.  The right door is to one of the small storage rooms.This is in the main shop area. The left foor goes to the Rangers office and the bathroom. The right door is to one of the small storage rooms.

This looks from the main area toward a vehicle bay with it's own garage door.  Behind the lift is the other storage room / mechanical room.This looks from the main area toward a vehicle bay with it's own garage door. Behind the lift is the other storage room / mechanical room.

This is the cold storage section.  No heat here, but plenty of storage for tents, bunks etc.  The double door lead to the main shop area.  The smaller garage door is a loading dock, the right one is to drive in.This is the cold storage section. No heat here, but plenty of storage for tents, bunks etc. The double door lead to the main shop area. The smaller garage door is a loading dock, the right one is to drive in.

Main shop area again, looking from the double doors leading to the storage area.  There are garage doors on both sides for easy access.  No more stairs.Main shop area again, looking from the double doors leading to the storage area. There are garage doors on both sides for easy access. No more stairs.

Looking from the garage door in the vehicle bay to the double doors leading to the storage section.Looking from the garage door in the vehicle bay to the double doors leading to the storage section.