<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xml:base="http://campmattatuck.org" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel>
 <title>Camp Mattatuck Latest News</title>
 <link>http://campmattatuck.org/news</link>
 <description>Camp Mattatuck Latest News</description>
 <language>en</language>
<item>
 <title>Leever Lodge Update</title>
 <link>http://campmattatuck.org/news/leever-lodge-update-1</link>
 <description>&lt;p&gt;&lt;span style=&quot;font-size: small&quot;&gt;&lt;span style=&quot;font-family: arial,helvetica,sans-serif&quot;&gt;&lt;span style=&quot;font-family: arial,helvetica,sans-serif&quot;&gt;&lt;span style=&quot;font-size: small&quot;&gt;&lt;span style=&quot;font-size: 4pt; font-family: &#039;Verdana&#039;,&#039;sans-serif&#039;&quot;&gt;&lt;span style=&quot;font-family: arial,helvetica,sans-serif&quot;&gt;&lt;span style=&quot;font-size: x-small&quot;&gt;&lt;span style=&quot;font-size: 10pt; font-family: &#039;Arial&#039;,&#039;sans-serif&#039;&quot;&gt;As most people know by now, camp is in the process of building a 4000 sq ft training center named after Harold Leever, former President of the Mattatuck Council.  As you can see, it&#039;s no small under taking (check out the pictures).  From the front, the left hand wing will contain 2 bunk rooms holding about 12 each and two full bathrooms.  The right hand wing will contain another bathroom, office/storage and 4 adult bedrooms holding 4 each for a total projected capacity of 40 people.  The center (the place with the big trusses in the pictures) will be the &amp;quot;Great Room&amp;quot; used for meetings, ga&lt;/p&gt;
&lt;p&gt;&lt;a href=&quot;http://campmattatuck.org/news/leever-lodge-update-1&quot;&gt;read more&lt;/a&gt;&lt;/p&gt;</description>
 <pubDate>Mon, 08 Sep 2008 20:35:14 -0400</pubDate>
 <dc:creator>Rob Reed</dc:creator>
 <guid isPermaLink="false">398 at http://campmattatuck.org</guid>
</item>
<item>
 <title>Work Begins on the New Ranger&#039;s Workshop and Storage Building</title>
 <link>http://campmattatuck.org/news/work-begins-new-rangers-workshop-and-storage-building</link>
 <description>&lt;p&gt;Site work began on the location for the new Ranger&#039;s Workshop and Storage building.  It will a 100 x 50 building that will be used for storage of camp equipment (no more 1/2 full Dining Hall!) and a new Ranger&#039;s Workshop.  This &lt;a href=&quot;/sites/default/files/rangers%20shop.pdf&quot;&gt;link&lt;/a&gt; will show you a map of where is it located.&lt;/p&gt;
&lt;div style=&quot;text-align: center&quot;&gt;&lt;span class=&quot;inline inline-undefined&quot;&gt;&lt;img src=&quot;/sites/default/files/images/2008-08-01 new shop.jpg&quot; alt=&quot;&quot; title=&quot;&quot;  class=&quot;image image-_original&quot; width=&quot;600&quot; height=&quot;450&quot; /&gt;&lt;/span&gt;&lt;/div&gt;
&lt;div class=&quot;image-clear&quot;&gt;&lt;/div&gt;</description>
 <pubDate>Tue, 05 Aug 2008 10:17:22 -0400</pubDate>
 <dc:creator>Rob Reed</dc:creator>
 <guid isPermaLink="false">380 at http://campmattatuck.org</guid>
</item>
</channel>
</rss>
